Meccano Ltd. Engineering Drawings
UK DRAWING/JOB NUMBER - 239
Perforated Boiler
Meccano Part No. 162b (Boiler - No Ends)
Drawing Date - 21/05/1929
The following revisions are noted on the drawing:-
Issue 4 - 21/05/1929
Issue 5 - 09/08/1945
Issue 6 - 15/03/1946