Meccano Ltd. Engineering Drawings

MECCANO PART NUMBER - 104

Loom Shuttle

UK Drawing/Job No. 128 - (Shuttle (for Loom))

Drawing Date - 14/05/1929
The following revisions are noted on the drawing:-
Issue 2 - 14/05/1929
Issue 3 - 19/07/1929
Issue 4 - 01/09/1944
------------

UK Drawing/Job No. 128A - (Shuttle End - Plain)

Drawing Date - 21/05/1929
The following revisions are noted on the drawing:-
Issue 2 - 21/05/1929
Issue 3 - 14/07/1930
Issue 4 - 01/09/1944
------------

UK Drawing/Job No. 128B - (Shuttle End - Tapped)

Drawing Date - 22/05/1929
The following revisions are noted on the drawing:-
Issue 2 - 22/05/1929
Issue 3 - 14/07/1930
Issue 4 - 01/09/1944
------------

UK Drawing/Job No. 128C - (Shuttle Sides (for Loom))

Drawing Date - 24/05/1922
The following revisions are noted on the drawing:-
Issue 2 - 01/09/1944
------------

UK Drawing/Job No. 128D - (Shuttle Peg (for Loom))

Drawing Date - 25/05/1922
The following revisions are noted on the drawing:-
Issue 5 - 23/06/1945
------------

UK Drawing/Job No. 128E - (Shuttle Stud (for Loom))

Drawing Date - 24/05/1929
The following revisions are noted on the drawing:-
Issue 2 - 24/05/1929
Issue 3 - 01/09/1944
------------

UK Drawing/Job No. 128F - (Shuttle Rivet (for Loom))

Drawing Date - 25/05/1922
The following revisions are noted on the drawing:-
Issue 2 - 01/09/1944
------------

UK Drawing/Job No. 128G - (Collar For Shuttle)

Drawing Date - 27/05/1929
The following revisions are noted on the drawing:-
Issue 2 - 01/09/1944
------------

UK Drawing/Job No. 128H - (Spring for Shuttle)

Drawing Date - 28/05/1929
The following revisions are noted on the drawing:-
Issue 3 - 01/09/1944
------------